"GSF" The build on site Solution
Definition
- Concrete poured on site solution.
Advantages
- Continuously supported rail.
- Recycled rubber interface between rail and surrounding.
- Noise and vibrations reductions.
- Electrical insulation.
- Low maintenance system.
- Lowest life cycle cost and total cost of ownership in its class.
Applications
- New track, extension of existing track, track renewal.
- When construction height is limited. On bridges, in tunnels, etc….
- Complete track solution, integration of turnouts, dewatering devices, crossings and other special track work accessories.
- Monolithic covering, printed concrete, asphalt, washed-out concrete).
- Can be combined with floating slap system to maximize noise and vibration reduction.
Installation ratio
- 144 linear meters of single track per day based on one crew
Reference
- 292 km of single track between 1997 and now including Brussels, Paris, Madrid, Athens, Lisbon, Bergen, Casablanca, Rabat, Tunis, Saint Petersbourg, Hong Kong, …